Incineration of entire 358 tonnes of toxic waste from the defunct Union Carbide factory finally concluded as contaminated soil and packaging material were burnt at a disposal plant in Madhya Pradesh's Pithampur on Thursday, over six months after the consignment was brought to the unit.
Uploaded by:
Rediff Video Desk
on Thu, 03 Jul 2025 18:39:45 +0530
Views: 1